research-package RP-2026-07-23-EVAL-EXPERIMENTS

Agent Evaluation Experiment Registry

Experiment Registry

ID Experiment Status Independent variable Outcomes Decision
EX-E001 Task taxonomy and construct mapping Completed (design) Candidate task family Coverage gaps, grader needs Sixteen families identified; start with eight-task slice
EX-E002 ET-004 task-integrity pilot Provisionally complete Reviewer/task revision Validity label, alternative/partial/regressive probes Contract calibrated; independent review required
EX-E003 ET-014 task-defect pilot Provisionally complete Reviewer/task revision Defect label, alternative/persuasive-wrong probes Contract calibrated; independent review required
EX-E004 Deterministic probe calibration Completed in-sample Probe outcome class Classification match 7/7 declared classifications matched; no generalization claim
EX-E005 Baseline repeatability Blocked by EX-E002/003 Repeat number Outcome variance, failure classes, cost Choose sample size
EX-E006 Contamination controls Planned Git/web/gold access Performance and leakage indicators Choose fixture isolation policy
EX-E007 Blind fixture export preflight Completed Source vs exported fixture Gold/probe exposure Current pilots export without expected outcomes or grader code

EX-E001 Result

The repository can support a broad evaluation program, but current evidence is concentrated in documentation, research, and repository-governance work. A credible suite must report this sampling boundary and later add naturally occurring code/automation tasks.

No agent capability was tested in EX-E001.

EX-E002–E004 Results

  • Both task contracts contain all required metadata.
  • ET-004-P01 accepts two semantically equivalent complete edits and rejects one omitted status change plus one collateral regression.
  • ET-014-P01 accepts two defensible defect codes when evidence identifies the same contradiction and rejects a polished but invalid acceptance.
  • Calibration matched all seven declared outcome classes.
  • Neither pilot is independently reviewed; status is provisional rather than validated.
  • No model, agent, harness, stochastic run, token cost, or human-time baseline was measured.

Exact Next Experiment

After independent integrity review, execute EX-E005:

  1. export blind disposable fixtures without probe outcomes or expected labels;
  2. freeze the complete system configuration;
  3. run each pilot at least three times for exploratory variance;
  4. preserve final state, runtime, interventions, and failures;
  5. do not rank systems;
  6. use variance and failures to choose the next sample size and grader revision.